Bring the GPUs. We bring everything else.

A Castellan powered shell is a tenant-ready AI campus — secured power, building, electrical topology, and cooling backbone — leased all-in on long-tenor triple-net terms. You install the IT and run the compute. It is our flagship, all-in offering: powered land and a fully built-out facility, delivered as one.

15–20yr
Long-tenor triple-net lease
All-in
Power, shell & cooling delivered ready for fit-out
Tier III-eq
Electrical topology & redundancy
DLC-ready
Air, evaporative & direct-liquid cooling
01
What you lease

A complete campus, delivered to the edge of your rack.

Castellan delivers the powered shell: the hard, slow, capital-intensive layer that sits between raw land and a running GPU cluster. Everything up to the point where your equipment plugs in is ours to build and operate.

The tenant brings IT, GPUs, and network kit. Castellan brings the rest — and the power behind it.

  • 01
    Secured power
    Contracted, interconnected power from a pre-secured supply — the input that decides whether a campus is deliverable at all.
  • 02
    Building & containment
    Purpose-built structure with hot-aisle containment, designed for high-density GPU deployment.
  • 03
    Electrical topology
    Tier III-equivalent distribution, transformers, switchgear, and redundancy engineered for sustained load.
  • 04
    Cooling backbone
    Air, evaporative, and direct-liquid-cooling readiness plus the structured cabling backbone — sized for next-generation densities.
02
Tenant value · all-in

Why tenants lease with Castellan.

01
Power, already secured
No interconnection queue to inherit. The scarcest input is solved before you sign, drawn from access to +5 GW of power, available on demand.
02
Faster time-to-power
A powered shell compresses years of land, permitting, and power work into a lease you can move on now.
03
Predictable cost
Triple-net structure with transparent pass-through opex and defined escalators. No development surprises.
04
No land or permitting risk
Castellan carries siting, tenure, interconnection, and construction risk. You focus on compute.
05
Scale on one platform
Grow across phases and sites on a single operating platform — a minimum of 800 MW by 2032, scalable on demand.
06
Sovereign jurisdiction
Swiss-domiciled, neutral governance — a credible home for institutional, regulated, and government-grade workloads.
03
The lease & who leases

Long-tenor, triple-net, institutional.

Castellan delivers the shell and operates the facility envelope; the tenant operates the compute and pays power, opex, and maintenance under a triple-net framework — the same capital logic that underwrites institutional real estate.

We structure for hyperscalers, sovereign clouds, AI labs, and regulated enterprise — counterparties that value secured power, predictable cost, and a neutral jurisdiction.

Lease term
15–20 years, with rent escalators
Structure
Triple-net — tenant pays power, opex, maintenance
Delivery
Powered shell, ready for tenant fit-out
Electrical
Tier III-equivalent topology & redundancy
Cooling
Air · evaporative · direct-liquid-cooling ready
First availability
Phase I — United States · online 2028
04
From enquiry to operational

A structured path — live in roughly 18 months.

Typically 4–6 months from first conversation to a signed lease, then build to operational. Because power is pre-secured and our reference designs are standardised, a tenant can be live in roughly 18 months — a fraction of the industry norm.

01 · Months 0–1
Indicative discussion
Power need and capacity. Jurisdiction preference. Lease structure. Timeline target.
02 · Months 1–2
NDA & site disclosure
Mutual NDA execution. Site shortlist. Power specs and permits. Tour scheduling.
03 · Months 2–4
Letter of intent
Commercial framework. Site selection finalised. Engineering scoping. Exclusivity period.
04 · Months 4–6
Due diligence
Site technical DD. Castellan financial DD. Legal review. Title and permits verification.
05 · Months 6–9
Lease execution
MSA / lease drafting. Negotiation rounds. Internal approvals. Signing and build start.
06 · ≈ Month 18
Build & operational
Fit-out and integration. Commissioning and energisation. Handover — tenant operational.
Castellan · powered land secured
≈ 18 months to operational
Industry avg · greenfield, no pre-secured power
36–42 months
EU Tier-1 · Frankfurt / London / Dublin (grid queues)
60–66 months