Data centres for AI and HPC · Zug, Switzerland

The foundation
of sovereign AI

Castellan develops, builds and leases data centres for AI and high-performance computing — as a powered shell or fully fitted. A decade of operating experience from the Bitkern Group and access to more than 5 GW of power.

Power access More than 5 GW via our network
Heritage Bitkern Group · more than 300 MW delivered
Pipeline by 2032 800 MW minimum · 4 phases
Core business Powered Shell or Turnkey
Scroll
01 ⁄ 04
Manifesto

You need capacity for AI — power, space and cooling — when your roadmap needs it. We deliver it as a Powered Shell or as a turnkey data centre, on a long-term lease, supported by powered land, design and build, GPU procurement and third-party compute capacity.

Capacity of this kind is scarce. Power and grid connections are the bottleneck, and most AI compute is concentrated with a few hyperscalers — a strategic risk for any organisation whose data and workloads must stay under its own control.

Castellan closes that gap with the physical layer: dedicated facilities, delivered on long-term leases by a Swiss counterparty. Read the full vision →

~75%
Share of global GPU-cluster performance located in the United States (Epoch AI, 2025)
€200B
EU InvestAI initiative to mobilise investment in AI (European Commission, 2025)
>2×
Global data-centre electricity demand by 2030, ~945 TWh (IEA, 2025)
Swiss AG
Swiss counterparty, neutral jurisdiction, long-term lease documentation
02 ⁄ 04
Heritage

Castellan does not start from zero. We draw on the Bitkern Group and its decade of operating large-scale power and compute infrastructure: its operating expertise, its supplier and site network, and part of its team. Castellan is independent and develops its own sites, purpose-built for AI.

Through that network we have access to more than 5 GW of power, together with established supplier relationships and sites well suited to AI. For our customers, that means a shorter path to power.

Most entrants start from zero on power. Castellan starts with the hardest asset already in hand. Our heritage in full →

10 yrs
Of operating experience at the Bitkern Group
+300 MW
Delivered by the Bitkern Group to date
+5 GW
Of power accessible through our network
Energy
Established power-supply & procurement relationships
03 ⁄ 04
Services

Everything between powered land and running GPUs.

01 — Powered Land

Secured, powered land. You develop.

Land secured on long-term tenure, with grid interconnection and access to power — the scarcest input in AI. For operators who want to build on their own terms.

Powered Land → +5 GW
02 — Design & Build

Data-centre design and build, end to end.

Electrical, cooling and construction — planned, managed and delivered by one team until the facility is ready for IT load. We build our own portfolio this way, and offer the same capability to third parties for facilities they will own.

Design & Build → Design to IT load
Core business
03 — Powered Shell & Turnkey

Built and leased: powered shell or turnkey.

Two delivery models, both on a 15–20-year triple-net lease. Powered Shell: land, power, building shell and core infrastructure — you fit it out to your own specification. Turnkey data centre: fully fitted, with electrical distribution, cooling and white space — you only bring your GPUs.

Powered Shell & Turnkey → 15–20 years
04 — GPU Procurement & Trading

GPU & HPC hardware, procured at scale.

NVIDIA H100, H200, B200 and GB200 systems, networking and storage — from single cards to complete, integrated racks. Sourced through the Bitkern Group's supplier network, with allocation, pricing and delivery logistics handled for you.

GPU Procurement & Trading → H100–GB200
05 — AI Compute

GPU capacity, without owning hardware.

Bare-metal GPU clusters and reserved capacity blocks for training, fine-tuning and inference, worldwide. You contract with Castellan; we source the capacity from vetted third-party hardware owners, so you can book compute without building or buying anything.

AI Compute → Bare metal
06 — Compute Monetization

Idle AI hardware, turned into revenue.

Is your AI hardware running below capacity? We connect you with contracted compute buyers (offtakers) and turn idle GPU hours into revenue.

Compute Monetization → Contracted buyers
07 — HPC Hosting

Hosting for your GPU & HPC hardware.

Colocation in data centres across Europe and North America, and beyond on request — high-density racks for H100 to GB300 systems, DLC-ready cooling, 24/7 operations and remote hands. Your machines, our uptime — with optional monetization of idle time.

HPC Hosting → Europe · North America
04 ⁄ 04 · Roadmap

From first lease signed to at least 800 MW of AI capacity by 2032.

800MW
Minimum pipeline by 2032 · capacity to grow into
+5GW
Power access through our network
≤24months
From signed lease to power · land and power pre-secured
20years
Security of tenure for up to 20 years · triple-net leases
“
Every country needs to own the production of their own intelligence.
Jensen Huang · NVIDIA · World Governments Summit, Dubai, 2024
Cumulative capacity 800 MW
Phase I · 2027–2028
+50 MW
Launch
Europe or North America, site to be confirmed. Construction from 2027, commissioning 2028.
Phase II · 2029–2030
+150 MW
Expansion
Europe / North America, sites to be confirmed. 200 MW cumulative.
Phase III · 2030–2031
+200 MW
Scale-up
Europe / North America, sites to be confirmed. 400 MW cumulative.
Phase IV · 2031–2032
+400 MW
Full build-out
Europe / North America, sites to be confirmed. At least 800 MW cumulative by 2032.

First site — Phase I is a greenfield campus of at least 50 MW in Europe or North America, with construction in 2027 and commissioning in 2028. Tenants can lease capacity as a Powered Shell or as a turnkey data centre, on triple-net terms.

A
Leadership

Built on a decade of power & compute operating DNA.

Operators across power, engineering, commercial, legal, finance and platform IT — drawing on a decade of operating experience from the Bitkern Group.

Meet the team
Insights

Notes from the frontier.

All insights →
Contact

Make an enquiry.

Tell us what you need. Every enquiry reaches our team and is routed to the right person.

Whether you need data-centre capacity, GPU hardware, compute or hosting, want to put your own AI hardware to work, or are a land or construction partner — we're glad to talk.

Prefer email? info@castellan-intelligence.com
Press press@ · Careers careers@