Sovereign-grade AI Infrastructure · Zug, Switzerland

The Foundation
of Sovereign AI

Castellan is a European company developing and operating sovereign-grade AI infrastructure — headquartered in Switzerland, with operations across Europe and the United States. It is built on the operating DNA of the Bitkern Group — an established power & compute infrastructure operator — with access to +5 GW of interconnected power.

Powered Land Access to +5 GW, on demand
Track Record +300 MW deployed · 10 yrs operating
Pipeline by 2032 800 MW minimum · 4 phases
AI Compute Bare-metal GPU · Sovereign cloud
Scroll
01 ⁄ 04
Manifesto

Castellan builds and operates the infrastructure your AI workloads run on — powered land, tenant-ready campuses, and sovereign GPU capacity under Swiss and European jurisdiction.

It is capacity the market barely offers: AI compute is becoming the most consequential infrastructure of the century, yet it sits concentrated in the hands of a few hyperscalers — a strategic exposure for every institution whose workloads cannot travel. Data sovereignty is not a slogan.

Castellan exists to close that gap — with the physical layer for sovereign-compliant AI, built and operated from Switzerland. Read the full vision →

85%+
AI compute capacity controlled by U.S. hyperscalers (BofA Global Research, 2025)
€200B+
EU AI infrastructure capex needed 2025–2032 (Morgan Stanley, 2025)
Power demand for AI workloads vs. legacy DC (IEA, 2025)
Swiss AG
Neutral jurisdiction, institutional governance, FINMA-aware structure
02 ⁄ 04
Heritage

Castellan does not start from zero. It is built on the operating DNA of the Bitkern Group — an established operator of large-scale power & compute infrastructure, with a decade of track record across energy and powered land.

Castellan has access to +5 GW of power, available as demand requires, alongside established energy-supply relationships — a position most newcomers simply cannot reach.

Most entrants start from zero on power. Castellan starts with the hardest asset already in hand. Our heritage in full →

10 yrs
Of operating experience the group brings to Castellan
+300 MW
Operated across the group to date
+5 GW
Of power Castellan has access to
Energy
Established power-supply & procurement relationships
03 ⁄ 04
Services

The full stack — from powered land to sovereign compute.

01 — Powered Land

Secured, powered land. You develop.

Land secured on long-term tenure, with grid interconnection and access to power — the scarcest input in AI. For operators who want to build on their own terms.

Powered Land → +5 GW
02 — Infrastructure

Data-centre build-out, project-managed.

From design to ready-for-rack — electrical, cooling, and construction planned, managed, and delivered end-to-end. We run the project; you own the result.

Infrastructure → Turnkey build
Flagship · all-in
03 — Powered Shell

The complete campus, leased. You bring the GPUs.

Land, power, and built infrastructure delivered tenant-ready on a long-tenor triple-net lease. Our core offering — everything in one, fast time-to-power.

Powered Shell → 15–20 yr
04 — HPC Hardware Procurement

GPU & HPC hardware, procured at scale.

Blackwell-class GPU systems, networking fabric, and storage — sourced through established OEM and distribution relationships. Pure GPU trading — from single cards to complete, integrated racks — with allocation access, price discipline, and delivery logistics handled end-to-end.

HPC Procurement → Blackwell-class
05 — AI Compute Services

Sovereign GPU capacity, as a service.

Bare-metal GPU clusters and reserved capacity blocks under Swiss and European jurisdiction — for training, fine-tuning, and inference. Compute you can contract, without building anything.

AI Compute → GPU cloud
06 — Compute Monetization

Idle AI hardware, turned into yield.

Your AI hardware runs below capacity? Castellan brings contracted offtakers and turns idle GPU-hours into revenue — for fleets, data-centre capacity, power, and sites.

Monetization → Contracted yield
07 — HPC Hosting

Hosting for your GPU & HPC hardware.

Colocation in data centres across Europe and beyond — high-density racks for H100 to GB300 systems, DLC-ready cooling, 24/7 operations and remote hands. Your machines, our uptime — with optional monetization of idle time.

HPC Hosting → Europe+
04 ⁄ 04 · Trajectory

From first lease signed to a minimum of 800 MW of sovereign-aligned AI capacity.

800MW
Minimum committed pipeline · 4 build phases
+5GW
Power available on demand
<18mo live
Time-to-power from signed lease · powered land pre-secured
20yr lease
Weighted-average tenant tenor · 15–20 yr leases
Every country needs to have its own sovereign AI infrastructure.
Jensen Huang · NVIDIA · 2024
Cumulative capacity 800 MW
Phase I · 2027–2028
+50 MW
Pilot
USA or EU — site TBD. Anchor lease in negotiation. Commissioning 2028.
Phase II · 2029–2030
+150 MW
Expansion
USA / EU (location TBD). Cumulative 200 MW operational. Track record established.
Phase III · 2030–2031
+200 MW
Continental
USA / EU (location TBD). Cumulative 400 MW. Mature operating platform.
Phase IV · 2031–2032
+400 MW
Mature Build
USA / EU (location TBD). 800 MW minimum platform, scalable on demand. Sovereign-AI infrastructure at scale.

First site — Phase I is a minimum 50 MW greenfield campus in the USA or EU (site TBD); construction 2027, commissioning 2028 — Castellan's first triple-net, sovereign-aligned campus.

A
Leadership

Built on a decade of power & compute operating DNA.

Six operators across power, engineering, commercial, legal, finance, and platform IT — a decade of running energy-intensive compute together at the Bitkern Group.

Meet the team
Insights

Notes from the frontier.

All insights →
Contact

Make an enquiry.

Tell us what you need. Every enquiry reaches our team and is routed to the right person.

Whether you're a prospective tenant, an enterprise looking for GPU compute, hardware, or hosting, or a land or construction partner — we're glad to talk.

Prefer email? info@castellan-intelligence.com
Press press@ · Careers careers@